濟南電纜(lan)橋(qiao)架(jia):線槽(cao)過(guo)線(xian)盒(he)及(ji)使(shi)用方法(fa)
過(guo)線(xian)盒(he)種(zhong)類很多(duo),在建(jian)築(zhu)、工(gong)業(ye)、以(yi)及家(jia)具各(ge)個(ge)方面(mian)都(dou)會用到(dao)。過(guo)線(xian)盒(he)為(wei)了施(shi)工方便,把(ba)分出(chu)來的線(xian)在特(te)定(ding)位置(zhi)集中布置(zhi)。在建(jian)築(zhu)中(zhong)做(zuo)管(guan)線預埋的時(shi)候(hou),有時因(yin)距(ju)離過長,會需(xu)要(yao)加(jia)過線(xian)盒(he)。
There are many types of junction boxes, which are used in various fields such as construction, industry, and furniture. For the convenience of construction, the separated wires are centrally arranged in specific positions in the wire box. When embedding pipelines in buildings, sometimes it is necessary to add a junction box due to the long distance.
現(xian)今很多(duo)家(jia)裝布線系(xi)統(tong)采(cai)用線(xian)槽(cao)明裝方式(shi),當采用過(guo)線(xian)盒(he)分線(xian)時(shi),當線槽(cao)安(an)裝(zhuang)插(cha)入過線(xian)盒(he)時(shi),在穿線時,槽(cao)蓋(gai)不(bu)宜打開(kai),放線(xian)步(bu)驟將(jiang)改成穿線,不僅費(fei)時(shi)費(fei)工(gong),當線路(lu)較(jiao)多(duo)時,不(bu)容易穿進;當線槽(cao)沒(mei)有穿進線盒(he)內(nei),需(xu)工(gong)人師(shi)傅(fu)進行(xing)粗略(lve)測(ce)量(liang),進(jin)行(xing)現場(chang)裁切(qie),施(shi)工質(zhi)量(liang)不(bu)精。線(xian)槽(cao)裁(cai)剪(jian)長度不能(neng)保證,施(shi)工完(wan)後(hou)整(zheng)體(ti)美(mei)觀(guan)影(ying)響較大。
Nowadays, many home wiring systems adopt the exposed installation method of cable trays. When using a junction box for branching, when installing and inserting the cable tray into the junction box, the tray cover should not be opened when threading. The wiring step will be changed to threading, which is not only time-consuming and laborious, but also difficult to thread in when there are many lines; When the wire duct is not threaded into the wire box, workers need to conduct rough measurements and on-site cutting, resulting in poor construction quality. The cutting length of the trunking cannot be guaranteed, and the overall aesthetics will be greatly affected after construction.
線(xian)槽(cao)過(guo)線(xian)盒(he)的優點:
Advantages of wire trough passing through wire box:
1.通過接(jie)線盒(he)的通(tong)線槽(cao)就可(ke)將(jiang)每(mei)股連接(jie)線分開(kai),避免連接線間的相(xiang)互(hu)纏(chan)繞。
1. The connecting wires can be separated from each other through the wire groove of the junction box, avoiding entanglement between the connecting wires.
2.電子元件密(mi)封在接線盒(he)中(zhong),密(mi)封性能(neng)好(hao),因(yin)此可(ke)以(yi)方便地應(ying)用於各(ge)種(zhong)環(huan)境(jing)中,例(li)如潮濕、腐蝕(shi)、液(ye)體(ti)等環(huan)境(jing)中。
2. Electronic components are sealed in junction boxes with good sealing performance, making them easy to apply in various environments, such as humid, corrosive, and liquid environments.
為(wei)了解(jie)決現有技(ji)術(shu)中(zhong)過(guo)線盒(he)在(zai)使(shi)用過(guo)程中線(xian)槽(cao)安(an)裝(zhuang)插(cha)入不便,費(fei)時(shi)費(fei)工(gong),時,在穿線時,槽(cao)蓋(gai)不(bu)宜打開(kai),放線(xian)步(bu)驟將(jiang)改成穿線,不僅費(fei)時(shi)費(fei)工(gong),現場(chang)裁切(qie)線槽(cao),施(shi)工質(zhi)量(liang)不(bu)精,汙(wu)染大,不(bu)夠(gou)經(jing)濟等問題(ti),而提(ti)供壹種(zhong)安(an)裝(zhuang)快捷(jie),省時省力,施(shi)工周期短(duan),無(wu)需(xu)現(xian)塊裁(cai)切(qie),只需(xu)要(yao)現場(chang)裝配(pei)式(shi)施(shi)工,噪(zao)音小(xiao),汙(wu)染小(xiao),經(jing)濟的線(xian)槽(cao)過(guo)線(xian)盒(he)及(ji)其使(shi)用方法(fa)。

In order to solve the problems of inconvenient installation and insertion of the centerline groove during the use of the existing technology, time-consuming and labor-intensive, the groove cover should not be opened when threading, and the wire laying step will be changed to threading, which not only consumes time and labor, but also results in poor construction quality, high pollution, and insufficient economic and environmental protection when cutting the wire groove on site. This provides a fast installation, time-saving and labor-saving, short construction cycle, no need for on-site cutting, only on-site assembly construction, low noise, low pollution, and economical and environmentally friendly wire groove through box and its use method.
技(ji)術(shu)方案(an):
Technical solution:
壹種(zhong)線槽(cao)過(guo)線(xian)盒(he),包(bao)括(kuo):盒(he)體(ti),所述的盒(he)體(ti)包(bao)括(kuo)盒(he)底(di)和(he)盒(he)壁(bi),所述的盒(he)壁(bi)上沿(yan)垂直(zhi)方向(xiang)開(kai)設有多(duo)個完(wan)全(quan)開(kai)放的開(kai)口;擋(dang)板(ban),所述的擋(dang)板(ban)滑動(dong)拆卸(xie)連(lian)接(jie)在(zai)開(kai)口上;所述的擋(dang)板(ban)上設置(zhi)有可(ke)實現(xian)擋(dang)板(ban)折斷(duan)形式(shi)插(cha)槽(cao)的有折斷(duan)結構(gou);蓋(gai)板(ban),所述的蓋(gai)板(ban)固定在(zai)盒(he)體(ti)的上端(duan)。
A wire trough through wire box comprising a box body, wherein the box body comprises a box bottom and a box wall, and multiple fully open openings are opened vertically on the box wall; A baffle, wherein the baffle is slidably disassembled and connected to the opening; The baffle is equipped with a broken structure that can achieve a slot for the baffle to be broken; A cover plate is fixed at the upper end of the box body.
該線槽(cao)過(guo)線(xian)盒(he),通(tong)過對盒(he)體(ti)進行(xing)壹個(ge)全(quan)新的開(kai)發設計,在(zai)盒(he)體(ti)的各(ge)側(ce)盒(he)壁(bi)上開(kai)設有多(duo)個沿(yan)垂直(zhi)方向(xiang)設置(zhi)有開(kai)口,每(mei)個(ge)開(kai)口均(jun)為(wei)完(wan)全(quan)開(kai)放式(shi)結(jie)構(gou),將(jiang)盒(he)體(ti)的盒(he)壁(bi)分成多(duo)個獨(du)立的壁(bi)體(ti),而開(kai)口內(nei)部都滑動設置(zhi)有可(ke)滑(hua)出拆卸(xie)的擋(dang)板(ban),而在(zai)每塊擋(dang)板(ban)上均(jun)設有可(ke)折(zhe)斷(duan)結構(gou),當需(xu)要(yao)將(jiang)對應(ying)處的擋(dang)板(ban)所在的位置(zhi)作為(wei)插槽(cao)使(shi)用時(shi),只需(xu)要(yao)將(jiang)該(gai)處(chu)的擋(dang)板(ban)沿折(zhe)斷(duan)結構(gou)折(zhe)斷(duan)即形(xing)成插槽(cao),則(ze)線(xian)槽(cao)可(ke)以(yi)從(cong)外部向(xiang)內(nei)輕(qing)松插(cha)入,不需(xu)要(yao)現場(chang)對線槽(cao)進(jin)行(xing)裁切(qie),操作方便快捷(jie),當線槽(cao)放(fang)線(xian)完(wan)成後,在(zai)開(kai)口上滑(hua)入擋板(ban),將(jiang)蓋(gai)板(ban)固定在(zai)盒(he)體(ti)上,則(ze)實現(xian)快速(su)安(an)裝(zhuang),節(jie)少(shao)了人工,縮(suo)短了施(shi)工周期,而且(qie)該線槽(cao)過(guo)線(xian)盒(he),無(wu)需(xu)要(yao)要現場(chang)裁切(qie)加(jia)工,只需(xu)要(yao)現場(chang)裝配(pei)就可(ke)以(yi)完(wan)成施(shi)工,噪(zao)音小(xiao),汙(wu)染少,經濟(ji)。
The cable tray passes through the cable box, and through a new development design of the box body, multiple openings are set vertically on each side of the box wall, each of which is a completely open structure. The box wall of the box body is divided into multiple independent wall bodies, and sliding out and detachable baffles are set inside the openings. On each baffle, there is a foldable structure. When the corresponding baffle position needs to be used as a slot, the baffle at that position only needs to be broken along the foldable structure to form a slot. The cable tray can be easily inserted from the outside to the inside, without the need for on-site cutting of the cable tray. The operation is convenient and fast. After the wiring is completed, slide the baffle into the opening and fix the cover plate on the box body to achieve quick installation, save labor, and shorten the construction period. Moreover, the wire groove passes through the wire box without the need for on-site cutting and processing. Only on-site assembly is needed to complete the construction, with low noise, low pollution, and economic and environmental protection.
槽(cao)過(guo)線(xian)盒(he)的使(shi)用方法(fa),包(bao)括(kuo)以(yi)下步(bu)驟:
The usage method of the slot through wire box includes the following steps:
步驟1:線槽(cao)過(guo)線(xian)盒(he)的安(an)裝,將(jiang)盒(he)體(ti)通過(guo)盒(he)底(di)上的固定孔(kong)與安裝(zhuang)體(ti)固定連(lian)接;
Step 1: Install the wire trough through the wire box, and connect the box body to the installation body through the fixing hole on the bottom of the box;
步(bu)驟2:線槽(cao)的插(cha)接,將(jiang)線(xian)槽(cao)插(cha)接(jie)到(dao)開(kai)口上;
Step 2: Insert the wire slot and connect it to the opening;
步(bu)驟3:線槽(cao)的插(cha)接,根(gen)據(ju)需(xu)要(yao)設置(zhi)的線(xian)槽(cao)的方向(xiang)和數量(liang),將(jiang)線(xian)槽(cao)插(cha)入開(kai)口中(zhong);
Step 3: Insert the cable tray into the opening according to the direction and quantity of the cable tray that needs to be set;
步(bu)驟4:布線,打開(kai)線槽(cao)的槽(cao)蓋(gai),將(jiang)線(xian)束(shu)布設在線(xian)槽(cao)中(zhong)並(bing)通(tong)過(guo)盒(he)體(ti)實現(xian)方向(xiang)的改變,放線完(wan)成封上槽(cao)蓋(gai);
Step 4: Wiring, open the slot cover of the cable tray, lay the wiring harness in the cable tray and change the direction through the box body, and seal the slot cover after wiring is completed;
步(bu)驟5:安裝(zhuang)擋板(ban),將(jiang)插(cha)接(jie)有線槽(cao)的開(kai)口處(chu)的擋(dang)板(ban)沿折(zhe)斷(duan)結構(gou)折(zhe)斷(duan),並(bing)將(jiang)折(zhe)斷(duan)後的壹(yi)半(ban)的擋(dang)板(ban)插到(dao)線(xian)槽(cao)上方的開(kai)口上進(jin)行(xing)封堵(du),其余(yu)未(wei)插(cha)設線槽(cao)的開(kai)口處(chu)插(cha)入完(wan)整(zheng)的帶有折斷(duan)結構(gou)的擋(dang)板(ban);
Step 5: Install the baffle, break the baffle at the opening of the cable slot along the broken structure, and insert half of the broken baffle into the opening above the cable slot for sealing. Insert a complete baffle with a broken structure into the remaining openings that have not been inserted into the cable slot;
本文(wen)由(you)濟(ji)南電纜(lan)橋(qiao)架(jia)提(ti)供技(ji)術(shu)支(zhi)持(chi),更(geng)多(duo)的詳細精彩內(nei)容(rong)請點擊我(wo)們(men)的網(wang)站http://wdyvw.cn/,我(wo)們(men)將(jiang)會全(quan)心全(quan)意(yi)為(wei)您提(ti)供滿意(yi)的服(fu)務(wu)。
This article is supported by Jinan cable tray technology. For more detailed and exciting content, please click on our website http://wdyvw.cn/ We will wholeheartedly provide you with satisfactory service.
下壹(yi)篇(pian):核(he)電站濟南電纜(lan)橋(qiao)架(jia)安裝中存在(zai)的質(zhi)量(liang)問(wen)題(ti)
相(xiang)關文(wen)章(zhang) / Recommended news
- 濟南電纜(lan)橋(qiao)架(jia)安裝後的日(ri)常(chang)維(wei)護(hu)工(gong)作
- 山(shan)東電纜橋(qiao)架(jia)安裝後的日(ri)常(chang)維(wei)護(hu)工(gong)作
- 怎(zen)麽(me)預(yu)防濟(ji)南電纜(lan)橋(qiao)架(jia)的腐蝕(shi)?
- 山(shan)東省內(nei)的家(jia)用電(dian)纜(lan)橋(qiao)架(jia)使(shi)用壽命壹(yi)般(ban)是多(duo)久?
- 怎(zen)麽(me)維(wei)護(hu)保(bao)養(yang)家(jia)用的濟(ji)南電纜(lan)橋(qiao)架(jia)?
- 怎(zen)麽(me)檢(jian)測(ce)山(shan)東電纜橋(qiao)架(jia)的承(cheng)載能(neng)力?
- 怎(zen)麽(me)判(pan)斷(duan)濟南電纜(lan)橋(qiao)架(jia)的耐(nai)火(huo)等(deng)級(ji)?
- 山(shan)東電纜橋(qiao)架(jia)的材(cai)質(zhi)選擇需(xu)根(gen)據敷(fu)設環(huan)境(jing)的特(te)點進行(xing)匹配(pei)
- 山(shan)東電纜橋(qiao)架(jia)線槽(cao)什(shen)麽(me)情況(kuang)下(xia)設置(zhi)和不(bu)設置(zhi)跨接(jie)線的要(yao)求
- 全(quan)長大於30米(mi)的電(dian)纜橋(qiao)架(jia),中間增加(jia)與保護(hu)導(dao)體(ti)的連(lian)接怎(zen)麽(me)做(zuo)?
濟南電纜(lan)橋(qiao)架(jia)到(dao)底(di)需(xu)不(bu)需(xu)要(yao)跨接
安裝橋(qiao)架(jia)
安裝橋(qiao)架(jia)
安裝橋(qiao)架(jia)
防火(huo)橋(qiao)架(jia)


